Novartis
Case Study Global Pharmaceutical Company
client Global Pharmaceutical Company
challenge Hazardous area
solution Design and build
benefit Turnkey solution
challenge To design and install building services systems within sensitive and occupied hazardous areas. All work was undertaken with the minimum of disruption to the end users, whilst maintaining control of costs, quality, programme and safety.
solution Our experienced site management team liaised closely with both the clients' engineering team and their end users to develop a project from initial concept through to its conclusion.

Our designs and work schedules accommodated the demands of the end user and shift operation teams.

Our installations varied from minor refurbishment works through to the design, installation and validation of complex clean rooms.

Irrespective of the project size we are meticulous in our planning and coordination, which is vital to ensure that works are completed safely and on time.

To minimise disruption to the occupants we produced detailed method statements, which accommodate hazardous area constraints, working hours, the effects of noise on occupants and surrounding environments.
benefit We have developed a strong working relationship with both the end user and our clients' engineering team.

We have gained a reputation for reliability with works completed on time, often with limited timescales and always within budget.

Our ability to assist with preliminary designs and budget costs are a valuable asset to the site as our presence diminishes the necessity for costly external consultants.